Introduction Working with large amounts of data, that occur when transmitting burst data from the nodes to the Treon Gateway, needs to be taken into account when planning and deploying a mesh network.
The Treon Industrial Node might not be connected to the Treon Gateway The first method to check that the Treon Industrial Node is connected to the Treon Gateway can be done manually on the product:
Introduction In order for the Treon Industrial Node and Treon Industrial Node 6 to connect with the Treon Gateway and show as active in Treon Connect, you first need to activate them.
Introduction There are two alternative network deployments that solve common issues when working with large data in a mesh network.
There are ways to circumvent some of the mesh network’s features that in specific cases can stand against the optimal usage of the Treon products.
Introduction There are two alternative network deployments that solve common issues when working with large data in a mesh network.
There are ways to circumvent some of the mesh network’s features that in specific cases can stand against the optimal usage of the Treon products.
Introduction There are two alternative network deployments that solve common issues when working with large data in a mesh network.
There are ways to circumvent some of the mesh network’s features that in specific cases can stand against the optimal usage of the Treon products.
Introduction Using the Treon Magnetic Mount Adapter enables attaching Treon Industrial Node to uneven surfaces and without any opening for a bolt. The Treon Industrial Node will be pre-fixed by a magnet and the final installation must then be done with a suitable glue.
Introduction Using the Glue Mount Adapter enables attaching the Industrial Node to a flat surface with glue. It is possible to manually align the Industrial Node.
Installation with a Glue Mount Adapter requires a Treon Glue Mount Adapter, suitable glue, and a surface of 32 mm diameter.