fitting

Installation Treon Industrial Node and Industrial Node 6

Introduction When mounting the Treon Industrial Node and Treon Industrial Node 6 to a monitored equipment, it is important to consider the location of the sensor and the contact between the sensor and the machine.

Installation Treon Industrial Node and Industrial Node 6

Installation without Adapter

Introduction For this installation method, the Treon Industrial Node is directly attached to the machine surface. This minimizes the vibration transmission route for best measurement quality. Manual alignment of the Industrial Node is not possible with this installation method.

Installation with Treon Magnetic Mount Adapter

Introduction Using the Treon Magnetic Mount Adapter enables attaching Treon Industrial Node to uneven surfaces and without any opening for a bolt. The Treon Industrial Node will be pre-fixed by a magnet and the final​ installation must then be done with a suitable glue.

Installation with Treon Glue Mount Adapter

Introduction Using the Glue Mount Adapter enables attaching the Industrial Node to a flat surface with glue. It is possible to manually align the Industrial Node. Installation with a Glue Mount Adapter requires a Treon Glue Mount Adapter, suitable glue, and a surface of 32 mm diameter.

Installation with Treon Nut Adapter

Introduction It is possible to install your Treon Industrial Node and Industrial Node 6 either with or without epoxy. Option A: Nut adapter installation with epoxy:​ Minimum thread length can be less than 9 mm depending on the amount of epoxy​ Node alignment can be done manually​