Treon Industrial Node X

Treon Industrial Node X deployment strategy

Deploying the Treon Industrial Node X in an industrial environment is straightforward, but multiple factors need to be taken into consideration: the installation location on the monitored asset. the mounting methods.

Treon Industrial Node X installation location

Installation location The aim is to pick an installation location on the asset that has the best measurable vibration and temperature reading for predictive maintenance of the asset. As a general rule, mount the Treon Industrial Node X as close to the bearing load zone as feasible.

Mounting strategies for Treon Industrial Node X

Introduction When mounting the Treon Industrial Node X to an asset, consider the location of the sensor and the contact between the sensor and the machine. The best location to attach the sensor depends on the machine and the monitored vibration source.

Introduction to profiles

What is a profile? Measurement profiles define how and when a Treon Industrial Node X measures data. They ensure that vibration, temperature, and other condition-monitoring data is collected in a way that is relevant, reliable, and battery‑efficient for each asset.

Deployment of the Wirepas mesh network for Assets

Introduction Before deploying a Wirepas mesh network, it is important to learn about key principles of Wirepas mesh networks and solutions to common issues. When a Treon solution is deployed, it is key to plan the Wirepas mesh network before the actual on-site installation.

How profiles work

Measurement profiles define how the Treon Industrial Node X collects, processes, and sends data. By using profiles, you control when measurements are taken, what is measured, and how often data is sent to Treon Connect.

Activating the Mesh Network

Introduction Before and after the deployment of a Wirepas mesh network, it is important to test and troubleshoot common issues in deployment.  Testing the network Before you install the Treon products at the deployment site, first perform a dry-run of the system to test if the network functions properly.

Installation with Treon Bolt Mount Adapter

Introduction - Treon Bolt Mount Adapter With the Treon Bolt Mount Adapter, the Treon Industrial Node X is directly attached to the machine surface. This minimizes the vibration transmission route for best measurement quality.

Large data in a Wirepas mesh network

Introduction Working with large amounts of data, that occur when transmitting burst data from the nodes to the Treon Gateway, needs to be taken into account when planning and deploying a mesh network.

Installation with Treon Orientation Adapter

Introduction With the Orientation Adapter, the Treon Industrial Node X is attached to the machine surface using a threaded mounting hole. The adapter enables manual alignment, allowing the measurement axes to be oriented as needed for the monitored equipment.